A dump truck needs to have a load of at least 4,200 kilograms before leaving the station. If the loading system can deliver at an average rate of 350 kilograms per minute, what is the minimum number of minutes the loading system must operate on a truck before the truck has enough load to depart?
Digital SAT Math Test 3 Question 8
8/11
Click to copy your unique test URL. Return anytime using this link.